|
|
Portfolio
Here we have assembled brief descriptions of a few major projects that illustrate how and why the products we represent were utilized. (Photos are shown where possible).
Click on a project name for specific information:
- Madigan Hospital - This Army Hospital in Fort Lewis, WA utilizes ASCO controls and closed transition transfer switches to run the 5 x 850 KW emergency power plant.
- University of Washington - This sparkling campus located in Seattle, WA utilizes ASCO controls to run the 15 MW, 4160 volt power plant. The plant serves the majority of the campus as well as the medical center.
|